The Boston Fire Department classified the building as a high rise due to the high lofts (unlike most jurisdictions that classify it according to the highest normally occupied level) and the project was required to adhere to Boston’s high rise code standards. The complex houses a 2,600-seat theater with a stage and audience chamber, balcony, a multi-story lobby, grand foyer, ticket office, dressing/wardrobe rooms, staff lockers, and office space. Keith, the “father of vaudeville.” In 1995, National Trust for Historic Preservation’s listed it as one of the “11 Most Endangered Historic Places.” Henry Adams worked with Martinez & Johnson Architecture on the Opera House renovation for ClearChannel Entertainment. Originally designed in 1928 by preeminent architect Thomas White Lamb, The Opera House was constructed as a memorial to B.F.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |